Upgrading PLCs to IEC 61499 with SDA as an orchestration layer

PUBLISHED: 14 October 2026

Most plants have a mix of PLCs of different ages and makes, and nobody wants to replace them all at once. This post explains how Software Defined Automation (SDA) built on IEC 61499 can be added as an orchestration layer above the existing controllers, so that a site can modernise step by step rather than in one risky project.

The challenge with a big bang upgrade

When an old PLC needs replacing, the traditional answer is a like for like swap: new hardware, a converted program, a weekend shutdown and a nervous Monday morning. Multiply that by every controller on site and it becomes a programme that takes years, costs a great deal and never quite finishes, because by the time the last one is done the first one is getting old again.

The reason it is so painful is that the control logic, the machine interlocks, the recipes and the data collection are all mixed together inside each PLC. Touching one means touching all of them.

What an orchestration layer does

An orchestration layer is a piece of software that sits above the existing PLCs and coordinates them. It runs on an industrial PC, an edge device or a small server, and it talks to each controller over the network using standard protocols such as OPC UA, Modbus or the manufacturer’s own protocol. The existing PLCs keep doing what they do best: fast, local control of the machine in front of them. The orchestration layer takes over the jobs that cut across machines, for example line sequencing, recipe management, production counts, alarms and reporting, and the connection to business systems.

Built on IEC 61499 and the UniversalAutomation.org runtime, that layer is independent of any PLC manufacturer. It does not care whether the controller underneath it is twenty years old or brand new, or who made it.

How the upgrade then happens

Once the orchestration layer is in place, the site has a path that avoids the big bang.

Step one: connect. The layer is connected to the existing PLCs as they are. No control logic changes. The immediate benefit is visibility: live data from every controller in one place, and the cross line functions handled consistently.

Step two: move the shared functions up. Logic that is duplicated across several PLCs, such as batch sequencing or interlocks between machines, is rebuilt once as IEC 61499 function blocks in the orchestration layer and switched over one machine at a time. Each PLC gets simpler and easier to maintain.

Step three: replace hardware when it suits you. When an old PLC finally has to go, only the local machine control has to be moved. That can be rebuilt as IEC 61499 blocks and run on a modern controller or edge device, or, where it makes sense, kept on a conventional PLC. Either way the orchestration layer above it is unchanged, so the rest of the line is not affected.

Step four: keep going. Because the application is portable, the next hardware change, and the one after that, are routine rather than projects in their own right.

What you gain along the way

Each step delivers something on its own, which is what makes the approach affordable. Visibility comes first, then easier maintenance, then freedom of hardware choice. There is no point at which the plant has to stop while everything is converted. The risk in each step is contained to one machine or one function, and it can be tested in a simulated environment before it goes anywhere near production.

It also gives the business a single, documented control application that is not locked to one supplier. That matters for spares, for support and for the day someone asks for a new report or a link to the ERP system.

Where to start

The starting point is usually a survey: what controllers are on site, how old they are, how they communicate, and which functions are duplicated between them. From that we can show which machines benefit from an orchestration layer first and what the phased plan looks like. Platinum offers this through our Software Defined Automation and Consultancy services. If you have a mix of ageing PLCs and a nervous feeling about the next shutdown, get in touch and we will talk it through.

Watch the videos

These two short videos explain the ideas in this article in plain English. They are part of our free software defined automation explainer videos.

Modernise without stopping, IEC 61499 What it means for your plant episode 6Play video

What it means for your plant, episode 6

Modernise without stopping

About 2 minutes

For most sites, the question is not whether to modernise. It is how to do it without stopping production. A complete replacement is expensive and risky, and it needs a long shutdown.

What this episode covers
  • Production keeps running, because no single step is large
  • Spending is spread over several years, and each step delivers a benefit of its own
  • Your team learns the new system on a small area first
  • You can start where the need is greatest: the oldest hardware, or the next extension
  • What to be clear about before you start
Change without the rewrite, IEC 61499 What it means for your plant episode 4Play video

What it means for your plant, episode 4

Change without the rewrite

About 2 minutes

No plant stays as it was designed. Products change, demand grows, and equipment is added.

What this episode covers
  • Changes cost less, because the work is limited to what is new
  • Changes carry less risk, because proven parts are left alone
  • Testing is focused on the change, not on the whole plant
  • The plant can follow the business, without waiting for the next big upgrade
  • What to be clear about before you start